203-213 East Main Street Adoption of Final ScopesPower Calverton Solar Energy Facility - SEISsPower Calverton Solar Energy Facility - DEISsPower Calverton Solar Energy Facility - FEISRiverview Lofts - VDEIS revised 7.31.17 - Appendix A - Appendix B - Appendices C & D - PlansRiverview Lofts - VDEIS
The Shops at Riverhead - Final EIS
Village at Jamesport - Final EISVillage at Jamesport - Draft EIS
Beacon Wireless, Wading River (Little Flower) - Final Scope for DEISBeacon Wireless, Wading River (Little Flower) - Draft Scope Historic Village at Jamesport - Final Scope for DEIS
Rechler Center for Business & Technology - Draft Scope
FINAL - East Main Street Urban Renewal Area (EMSURA) Plan- October 2008
East Main Street Urban Renewal Plan - Updated 2008
East Main Street Urban Renewal Plan - Draft GEIS
The Shops at Riverhead Draft EIS Volume
Headriver EIS
F1 Long Island Sports Facility Draft EIS
F1 Long Island Sports Facility Final EIS
These documents are also available for viewing in the Town Clerk's Office.